PROJECT OVERVIEW

Get an overview and learn more about roles and functions in a wide variety of projects.


2026

01/2026 - 05/2026

ACTIVE INGREDIENT PRODUCTION |
Conversion/new construction of existing buildings

Project type:
Goal:
Role:
Budget:
Project team:
Conversion, active ingredient production BioTech
Quality assurance, savings
Construction Manager
On request
On request
Complexity: Medium

- Review and approval of factory and assembly drawings for the construction of the laboratory and production area
- Coordination of the construction of the clean room in the laboratory (Drug Substances) and production area (DP Area)
- Coordination of the construction of the laboratory area (laboratory furniture and general airlock equipment) - Management on site/regular participation in construction meetings - Coordination of the construction of the cold room - Coordination of interfaces between all trades involved (architecture, TGA, process) - Management of the construction site/regular participation in construction meetings Laboratory area equipment (laboratory furniture and general airlock equipment)
- Management on the construction site/regular participation in construction meetings
- Coordination of cold room expansion
- Interface coordination between all trades involved (architecture, TGA, process)
- Deputy construction management overall
- Construction management and participation in regular construction meetings


2025

06/2025 - 12/2025

ACTIVE INGREDIENT PRODUCTION |
Conversion/new construction of existing buildings

Project type:
Goal:
Role:
Budget:
Project team:
Conversion, active ingredient production BioTech
Quality assurance, savings
Construction Manager
On request
On request
Complexity: Medium

- Review and approval of factory and assembly drawings for the construction of the laboratory and production area
- Coordination of the construction of the clean room in the laboratory (Drug Substances) and production area (DP Area)
- Coordination of the construction of the laboratory area (laboratory furniture and general airlock equipment) - Management on site/regular participation in construction meetings - Coordination of the construction of the cold room - Coordination of interfaces between all trades involved (architecture, TGA, process) - Management of the construction site/regular participation in construction meetings Laboratory area equipment (laboratory furniture and general airlock equipment)
- Management on the construction site/regular participation in construction meetings
- Coordination of cold room expansion
- Interface coordination between all trades involved (architecture, TGA, process)
- Deputy construction management overall
- Construction management and participation in regular construction meetings

2025

11/2024 - 05/2025

ACTIVE INGREDIENT PRODUCTION |
Conversion/new construction of existing buildings

Project type:
Goal:
Role:
Budget:
Project team:
Conversion, active ingredient production BioTech
Quality assurance, savings
Project engineer/process architect
On request
On request
Complexity: Medium

- Recording user requirements for the construction of new cleanroom areas in the existing building
- Detailed planning of airlocks and cleanroom modifications in the DD phase
- Detailed planning of the entire laboratory area (Cell Lab, Purifcation, Molecular Lab)
- Preparation of tender documents (cleanroom, laboratory area and airlock facilities)
- Support with 3D collision planning and layout development
- Detailed planning of ancillary areas (e.g. cold storage and technical areas) - Support with ventilation planning (preparation of room books, recording of as-built plans) - Interface coordination with EHS, building automation and other tradese.g. cold storage, technical areas)
- Support with ventilation planning (creation of room books, recording of as-built plans)
- Interface coordination with EHS, building automation and other trades


2024

01/2024 - 12/2024

PROCESS OPTIMIZATION |
Implementation of regulatory requirements

Project type:
Goal:
Role:
Budget:
Project team:
Quality assurance, medical devices
Compliance with normative requirements
Project manager
On request
4 people
Complexity: Medium

- Planning and execution of tests in the area of process development & process design
- Creation of specifications for equipment procurement
- Execution of risk analyses (FMEA)
- Creation, updating and training of process, test and work instructions
- Execution and documentation of required validations / re-validations of processes & software - Planning of physical product properties - Qualification & validation of packaging, transport, washing and cleaning processes in connection with products - Qualification & validation of cleanrooms (FMEA) Software
- Planning the implementation of physical product properties
- Qualification & validation of packaging, transport, washing and cleaning processes in connection with products
- Qualification and validation of cleanrooms (ISO class 7/8 according to DIN EN 14644)
- Preparations for internal and external audits


2023

07/2023 - 10/2023

ACTIVE INGRIDIENT PRODUCTION |
Bulk filling conversion with insulator

Project type:
Goal:
Role:
Budget:
Project team:
Conversion, active ingredient production BioTech
Quality assurance, savings
Project engineer/process architect
On request
On request
Complexity: Medium

- Planning of a conversion in the area of bulk filling (isolator and lifting columns)
- Identification of required interfaces
- Estimation of conversion measures by inventory
- Creation of specifications
- Support in 3D collision planning
- Creation of a dismantling concept
- Technical support for the re-qualification of the cleanroom


2023

01/2023 - 12/2023

PROCESS OPTIMIZATION |
Implementation of regulatory requirements

Project type:
Goal:
Role:
Budget:
Project team:
Quality assurance, medical devices
Compliance with normative requirements
Project manager
On request
4 people
Complexity: Medium

- Planning and execution of tests in the area of process development & process design
- Creation of specifications for equipment procurement
- Execution of risk analyses (FMEA)
- Creation, updating and training of process, test and work instructions
- Execution and documentation of required validations / re-validations of processes & software - Planning of physical product properties - Qualification & validation of packaging, transport, washing and cleaning processes in connection with products - Qualification & validation of cleanrooms (FMEA) Software
- Planning the implementation of physical product properties
- Qualification & validation of packaging, transport, washing and cleaning processes in connection with products
- Qualification and validation of cleanrooms (ISO class 7/8 according to DIN EN 14644)
- Preparations for internal and external audits


2022

06/2022 - 12/2022

PROCESS OPTIMIZATION |
Implementation of regulatory requirements

Project type:
Goal:
Role:
Budget:
Project team:
Quality assurance, medical devices
Compliance with normative requirements
Project manager
On request
4 people
Complexity: Medium

- Planning and execution of tests in the area of process development & process design
- Creation of specifications for equipment procurement
- Execution of risk analyses (FMEA)
- Creation, updating and training of process, test and work instructions
- Execution and documentation of required validations / re-validations of processes & software - Planning of physical product properties - Qualification & validation of packaging, transport, washing and cleaning processes in connection with products - Qualification & validation of cleanrooms (FMEA) Software
- Planning the implementation of physical product properties
- Qualification & validation of packaging, transport, washing and cleaning processes in connection with products
- Qualification and validation of cleanrooms (ISO class 7/8 according to DIN EN 14644)
- Preparations for internal and external audits


2022

03/2019 - 02/2022

GLOBAL STANDARDIZATION | Hardening Processes

Project type:
Goal:
Role:
Budget:
Project team:
Restructuring, medical devices
Standardization, cost savings
Project engineer, quality engineer
On request
On request
Complexity: Medium
- Standardization of the hardening process
- Comprehensive test planning
- Definition of the new hardening process & rollout
- Presentation of the project status
- Contact person for process validation
- Process optimization


2021

09/2019 - 02/2021

NEW CLEANROOM CONSTRUCTION | Complete planing

Project type:
Goal:
Role:
Budget:
Project team:
New building, medical devices
Production expansion, securing location
Project manager
On request
On request
Complexity: Very high

- Project management from project start, design planning, detailed planning, construction supervision, acceptance & qualification
- Specifications for layout and infrastructure planning
- Cost estimation support
- Preparation of technical documents (URS)
- Internal and external interface coordination
- Responsible for managing the qualification of cleanroom & process equipment
- Close cooperation with authorities
- Specifications for the validation of washout processes
- Participation in risk analyses


2021

08/2019 - 08/2021

PRODUCTION TRANSFER | Existing production Line

Project type:
Goal:
Role:
Budget:
Project team:
Production transfer & conversion, medical devices
Growth increase, cost savings
Project manager (clean room & infrastructure)
On request
On request
Complexity: Medium - High

- Production transfer planning
- Comprehensive inventory and process improvement
- Layout planning
- Interface coordination
- Transfer of production processes
- Main contact for qualification planning Process plants & clean rooms
- Preparation of risk analyses


2020

08/2019 - 11/2020

STANDARDIZATION | Final Cleaning Processes

Project type:
Goal:
Role:
Budget:
Project team:
Restructuring
Sandardization, cost savings
Project manager
On request
On request
Complexity: Medium

- Creation of the central technical specifications (URS)
- Creation and programming of new washing programs
- Roll-out on 3 systems
- Comprehensive test planning
- Validation of the cleaning process
- Creation of the risk analysis
- Project cost estimates and scheduling
- Interface coordination


2020

02/2019 - 11/2020

REVAMP & STANDARDIZATION | Inventory clean rooms

Project type:
Goal:
Role:
Budget:
Project team:
Conversion
Compliance with necessary normative requirements
Project engineer, head of qualification
On request
On request
Complexity: Medium

- Carrying out a GAP analysis taking into account international norms & standards
- Layout planning for the introduction of a uniform lock concept
- Interface coordination
- Head of qualification planning
- Close consultation with management
- Training of employees


2019

10/2019 - 12/2019

PROCESS OPTIMIZATION I Balloon forming process

Project type:
Goal:
Role:
Budget:
Project team:
Re-structuring
Compliance with necessary normative requirements
Project engineer
On request
On request
Complexity: Medium -High

- Implementation of GAP analyses taking into account international norms & standards
- Detailed process optimization of a molding process
- Roll-out on 8 molding systems
- Comprehensive test planning
- Time & budget planning
- Supporting planning in the optimization of the associated cleanroom processes
- Interface coordination
- Management of qualification & validation measures
- Close consultation with production management
- Training of employees


2017

12/2015 - 08/2017

NEW CLEANROOM CONSTRUCTIO | OSD Solids production

Project type:
Goal:
Role:
Budget:
Project team:
New building, OSD
Production expansion, growth increase
Project engineer (clean room & infrastructure)
On request
On request
Complexity: High

> Basic Design Phase <
- Planning of material and personnel flows as well as zone layout
- Supporting planning for the infrastructure of process equipment and cleanroom monitoring
- Planning of airlock processes and airlock equipment as well as interfaces to automation
- Basic coordination with all trades involved (construction & TGA, process, automation)
- Partial responsibility for cleanroom fit-out
- Design cost estimates (DCE) for the entire cleanroom area
- Value engineering and cost savings

> Project flow detail design phase <
- Responsibility for logistical material and personnel flows, adaptation of zone layout
- Overall responsibility for cleanroom fit-out
- Preparation of the bill of quantities and technical specifications for the overall cleanroom fit-out
- Supporting plant and 3D planning as well as supporting piping planning
- Interface coordination with all trades involved (architecture, TGA / construction etc.) - Preparation of process equipment and GMP integration in cleanroom construction - Preparations for the construction of plant and cleanroom areas - Preparations for the qualification of equipment and cleanroom areas
- Installation of process equipment and GMP-compliant integration in the cleanroom construction
- Preparations for the construction of the plant and cleanroom areas
- Preparations for the qualification of equipment and the cleanroom
- Support in the detailed planning of the granulation plant


2015

08/2015 - 11/2015

PROJECT SUPPORT | OSD Solids Production

Project type:
Goal:
Role:
Budget:
Project team:
New building, OSD
Production expansion, growth increase
Project engineer
On request
On request
Complexity: Low

- Analysis and progress measurements of the project status and progress based on required documents
- Cost and hourly estimates of human resources
- Preparation of project documents


2015

08/2015 - 11/2015

REVAMP OF INTERLOCKS | OEB3 Production Area

Project type:
Goal:
Role:
Budget:
Project team:
Oncology, OSD
Production expansion, growth increase
Supporting project engineer
On request
On request
Complexity: Very high

- Programming of the airlock control system
- Support in the creation of drawings and parts lists
- Creation of GMP-compliant technical documentation
- Project engineer and deputy project manager on site
- Support in the metrological planning and installation of the walls and ceilings
- Assistance in the installation of the cleanroom ceilings and walls
- On-site interface coordination between the cleanroom and the cleanroom management Logistics, QM, Production and Engineering Fa. Baxter


2015

05/2015 - 06/2015

NEW CLEANROOM CONSTRUCTION | GMP AREA | Hospital

Project type:
Goal:
Role:
Budget:
Project team:
New construction, GMP processing
Production expansion
Supporting project engineer
On request
On request
Complexity: High

- Programming of the airlock control system
- Support in the creation of drawings and parts lists
- Creation of GMP-compliant technical documentation
- Project engineer and deputy project manager on site
- Support in the metrological planning and installation of the walls and ceilings
- Assistance in the installation of the cleanroom ceilings and walls
- On-site interface coordination between the cleanroom and the cleanroom management Logistics, QM, Production and Engineering Fa. Baxter


2014

06/2014 - 08/2014

CLEAN CLEANING SYSTEM CERTIFICATION |
IPA Fraunhofer Stuttgart

Project type:
Goal:
Role:
Budget:
Project team:
New building, GMP preparation
Production expansion
Working student
n/a
n/a
Complexity: n/a

- System certification in cooperation with the IGA Fraunhofer
- Main contact person for the evaluation of cleanroom systems in accordance with ISO EN 14644, VDI2083
- Support in the preparation of the overall report


2009

04/2014 - 07/2009

INTRODUCTION OF A DRIVERLESS TRANSPORT SYSTEM | GMP OSD Production Area

Project type:
Goal:
Role:
Budget:
Project team:
Re-organization, packaging
Cost savings
Supporting project engineer
On request
On request
Complexity: Medium

- Statistical preparation of data for the introduction of driverless transport systems in the GMP production and packaging area
- Support in the preparation of the technical specifications
- Determination of suitable vehicle types (consideration of routes, loads and geometries)
- Definition and specification of fixed docking stations
- Support in the conversion of the packaging and logistics area
- Support in the creation of a simulation model
- Collaboration in the selection of suppliers
- Support in the comparison of offers

2009

04/2014 - 07/2009

Support planning for GMP production areas

Project type:
Goal:
Role:
Budget:
Project team:
Conversion
Cost savings, sustainability
Supporting project engineer
n/a
n/a
Complexity: Medium

- Support for various projects in the Engineering department
- Comprehensive data evaluation and simulation for the introduction of a driverless transport system in final packaging
- Measurement-based recording of energy flows for building services and process plants
- Creation of a comprehensive value stream analysis
- Support in the procurement of a pellet plant for the provision of cooling and process energy
- Optimization of the storage of semi-finished goods, support in the conversion of storage areas
- Contact person for technical issues between QM, production and engineering


AT A GLANCE


Completed projects

15

Projects > 0.5 million EUR


Within approx. 10 years in different functions and roles

Project budget

7.5

EUR million Maximum budget


Handling and responsibility over different project budgets

Personnel deployment

20

Persons max.


Personnel deployment planning of small to large project teams

Average project duration

0.9

Years


Average time spent on projects